PROCEDURES
Site-specific safety and health plan
The Company has developed and implemented a written safety and health program for workers involved in
hazardous waste operations that shall be available for inspection by workers, their representatives and OSHA
personnel.
The program is designed to identify, evaluate, and control safety and health hazards in their facilities for the
purpose of worker protection, to provide for emergency response meeting The Company and regulatory
requirements and to address as appropriate site analysis, engineering controls, maximum exposure limits,
hazardous waste handling procedures and uses of new technologies.
The site safety and health plan shall be maintained on the job site. It shall identify and establish procedures for
protecting workers from safety and health hazards identified at each phase of site operations.
The Company written Hazard Communication Program shall be used to meet the requirements of 29 CFR
1910.1200 as part of the Company’s overall safety and health program implementation.
The Company site-specific safety and health plan will include the following components, as well as others when
required by the work:
x
x
x
x
x
x
x
x
x
x
x
Hazard analysis for each site task and operation contained in the work plan.
Worker training assignments in accordance with program and regulatory requirements.
Designation of personal protective equipment required for use by workers based on job hazard
analysis for specific tasks and operations.
Requirements of the medical surveillance program.
Information about frequency and types of air monitoring and personnel monitoring, as well as
any environmental sampling techniques and instrumentation that will be utilized. This shall
include methods of maintenance and protocols for the calibration of monitoring and sampling
equipment.
Site control measures as explained in the project’s site control program.
Requirements and procedures for decontamination.
Emergency response plan and procedures, including specific personal protective equipment and
other equipment anticipated to be needed for emergencies.
Safety procedures for entering any confined spaces as authorized by the site
superintendent. Any confined space entries shall be performed in accordance with The
Company’s Confined Space Entry Program.
The site-specific plan and program components for spill containment at the job site.
A pre-entry briefing shall be held prior to initiating any site activity, and at such other times as
necessary to ensure that workers are kept informed about site safety and health plan
3