Trenching and Excavation
Reference: A-15
DAILY EXCAVATION CHECKLIST
Date
Approximate Temp.
Approximate Wind
Direction
Safety Rep
Soil Classification
Excavation > 4 feet deep? ___Yes ___No.
If YES, fill out a Confined Space Permit PRIOR to ANY person entering the excavation.
NOTE: Trenches over 4 feet in depth are considered excavations. Any items marked NO on this form MUST
be remediated prior to any workers entering the excavation.
YES
NO
N/A
DESCRIPTION
GENERAL
Workers protected from cave-ins & loose rock/soil that could roll into the
excavation
Spoils, materials & equipment set back at least 2 feet from the edge of the
excavation
Engineering designs for sheeting &/or manufacturer's data on trench box
capabilities on site
Adequate signs posted and barricades provided
Training (toolbox meeting) conducted w/ workers prior to entering excavation
YES
NO
N/A
UTILITIES
Utility company contacted & given 24 hr. notice &/or utilities already located &
marked
Overhead lines located, noted, and reviewed with the operator
16